Short answer: In 2026, when building an AI content creation platform where drawing and short videos share one balance, billing should not be flattened into 'one charge per click.' Instead, first measure the compute cost baseline for each type of output, then convert them into the same point unit. A single drawing costs little; a short video that requires retrying several shots often has a compute cost tens to hundreds of times that of a single image. If both share one counting unit, users will easily ask, 'Why does drawing dozens of images raise no questions, while cutting three videos drains the balance?' A more stable approach is to expose only one balance on the front end while keeping two ledgers in the back end: cost and points.

Why do drawing and video editing feel so different within the same quota

The two are not the same kind of product in cost structure. On common cloud GPUs, the converted cost of a single image generally falls in the range of a few cents to a few tenths of a yuan; a ten-second-level short video that needs retries across several shots often has a converted compute cost tens to hundreds of times that of a single image, plus time spent queuing for and occupying GPUs. Putting these into the same 'count' is equivalent to pricing goods with different units at the same price, so month-end reconciliation naturally fails.

Failure costs are even trickier. Video tasks take longer, and the failure rate is an order of magnitude higher than image generation; one retry can consume tens of minutes of GPU time, while rerunning a failed image is almost imperceptible. If charges are deducted only on successful output, the platform absorbs all failure costs; if charges are deducted when a task is initiated, users feel arbitrarily charged. These disagreements need to be settled during billing-policy design. Changing them after launch typically means across-the-board customer complaints and reconciliation rework.

Four layers: capability layer, business layer, carrier layer, and data and risk control layer

Billing in a content platform is not just a finance issue; it is also an architecture issue. 'How compute is spent' and 'what users see' must be decoupled; otherwise, an upstream price change will require front-end changes.

  1. Capability layer: Register unit prices and resource profiles for each model and modality. Images by image or by diffusion steps; video by 'seconds × resolution tier × whether audio is included'; speech by character or second; text by token. This layer recognizes only cost, not users.
  2. Business layer: Convert costs into unified points, then define how many points each action consumes—for example, how many images per generation, video in 5-second tiers, music per full track. Coefficients live in configuration and can be hot-updated.
  3. Carrier layer: Website, mini program, and App only determine how points are displayed; they do not change points. A mini program may say 'approximately enough for X images,' while the back end still uses points, so switching ends requires no recalculation.
  4. Data and risk control layer: Task-level transaction logs, usage dashboards, abnormal consumption alerts, concurrency limits, and failure refund policies. Missing any one of these makes billing periods prone to disputes.

How coefficients are set: measure first, convert second, write copy last

Reversing the order easily causes rework. Many platforms first have operations coin a line like '1 point per image, 20 points per video,' only to find after launch that video is losing money. When they go back to change the coefficients, the front end, agreements, and customer-service scripts all have to change together.

  1. Sample measurement: Run 200–500 typical tasks under real load, record GPU time, external API costs, and failure rates, and derive the cost range for each output type. The typical experience range for this step is 1–2 weeks.
  2. Set coefficients: Use the most frequent and cheapest output as baseline 1. Video commonly falls in the tens to hundreds; voiceover and music fall in the single digits to tens. Coefficients are stored in the database and can be changed in the back end.
  3. Back-calculate copy: Turn points into language users understand, and show both numbers at the same time—for example, 'This plan is approximately enough for X images or Y short videos.' If only one number is shown, customer service will be questioned.

The two approaches can be compared side by side:

  • Per-use billing: Less development work; it can typically go live in 1–2 weeks and suits single-modality small tools. After crossing modalities, costs easily invert, and later rework is more labor-intensive.
  • Point-based billing: Unified across modules and reconcilable; users face slightly higher comprehension cost and need balance estimates and usage dashboards; the typical experience range for additional rework is 2–6 weeks.

At delivery: which two rules should be locked first when launching in three weeks with a capped budget

Common constraints look like this: the client has a limited budget and requires the drawing and video modules to go live within three weeks, while brand assets and moderation rules are not finalized. In our content platform projects, the approach is to write down two hard rules before touching the interface: 'video in 5-second tiers' and 'review blocks and system errors are refunded; model generation failures are not refunded.' The cost is that operations must maintain an extra manual checklist; after the first version went live, the video failure rate was higher than estimated, and the conversion coefficients were reworked and recalculated once. Fortunately, points and display were separated, so only the coefficient table changed, and not a single line of the front end moved. If 'counts' had been written directly into the page, this rework would have required changing agreements and customer-service scripts as well.

Where it applies and where it does not

When it fits: content SaaS where multiple modalities share one account system; platforms that need to produce monthly usage reports for enterprise customers; scenarios that issue free trial quotas and need to control costs. In these cases, the reconciliation capability and pricing flexibility brought by a point system generally cover the development cost.

When it is not necessary: projects that do only a single modality (for example, only a drawing mini program), whose users are internal employees and do not involve settlement, or whose monthly invocation cost is only a few hundred yuan—a fixed package or simple count limit is enough. Forcing in a point system only adds a configuration table that no one maintains. It can be remembered in one sentence: Wait until the second modality is connected and needs to share a balance with the first modality, then add this metering system.

Frequently asked questions

If a video task fails, are points refunded or not?

A common practice is to refund review blocks and system errors but not model generation failures, and to disclose this on the page before charging, rather than writing it only in the agreement.

How should free quotas be issued so they are not easily abused?

Based on experience, issuing them through three layers—total points, per-modality daily caps, and rate limiting by both account and device—is more resistant to abuse than issuing by count alone, and makes it easier to identify which modality is being abused.

If an upstream model changes its price, which layer should be changed?

Usually only the conversion coefficients in the business layer; the unit prices in the capability layer and the front-end copy stay unchanged. Make coefficients hot-updatable configuration; do not release a version for one number.

Do private deployment customers still need this point system?

Yes, but it can be simplified into departmental quotas plus usage reports. In private deployment scenarios, the constraint is GPU resource allocation rather than charging, so metering granularity can be coarser.


If you are currently doing only one drawing module, you can skip the point system for now; when the second modality is connected and begins to share a balance with drawing, then complete it according to 'capability layer registers cost, business layer sets coefficients, carrier layer only handles display, data layer handles transaction logs.' A simple criterion for judging whether it is sufficient: changing a conversion coefficient once should not require a release, and users should be able to see on one screen approximately how many images and how many short videos they can generate. Platforms with a single module and purely internal use are not included; a fixed package is simpler.

Interested in this topic?
10-year tech team — reference proposal within 24 hours
Obtain Proposal
Are you ready?
Then reach out to us!
+86-13370032918
Discover more services, feel free to contact us anytime.
Please fill in your requirements
What services would you like us to provide for you?
Your Budget
ct.
Our WeChat
Professional technical solutions
Phone
+86-13370032918 (Manager Jin)
The phone is busy or unavailable; feel free to add me on WeChat.
E-mail
349077570@qq.com
Submitted successfully
Thank you for your trust. We will contact you soon!
Recommended projects for you